Major Clientele and Projects: ​​​​​​​
​​​​​​​
Hyundai Motors Manufacturing Indonesia
Location: Cikarang, Indonesia
Total Investement: $1.5 Billion USD
AEI Scope: Main Electrical Distribution Equipment, Power Monitoring, Installation & Commissioning
Owner: Hyundai Motors
Project Description: A 8.5 million square foot (192 acres) automobile manufacturing plant consisting of a press, body, paint, assembly, R&D and engine shop with an annual production capacity of 150,000 units. 
​​​​​​​

image-placeholder.png
KIA Motors India
 Location: Ananthapur, India
 Total Investment: $1.1 Billion USD 
 AEI Scope: Main Electrical Distribution Equipment, Power Panels Supply, Power Monitoring, Installation & Commissioning
 Owner: Kia Motors
 General Contractor: Hyundai Engineering
 Project Description: A 23 million square foot (536 acres) automobile manufacturing plant consisting of a press, body, paint, assembly and engine shop with an annual production capacity of 300,000 units. 


image-placeholder.png
KIA Motors India Affiliates
 Location: Ananthapur, India
 Total Investment: $1.1 Billion USD 
 AEI Scope: Main Electrical Distribution Equipment, Installation & Commissioning
 Owner: Hyundai Mobis, Dymos, Glovis & Steel
 General Contractor: Hyundai Engineering
 Project Description: Six ancillary plants consisting of a powertrain, seat, module, consolidation, vehicle process and steel shop to support main Kia Motors plant with an annual production capacity of 300,000 units. 


image-placeholder.png
Samsung Austin Semiconductor
  Location: West Point, Georgia
 Total Investment: $1 Billion USD 
 AEI Scope: Main Electrical Distribution Equipment, Emergency Power System & Power Panels Supply Installation & Commissioning
 Owner: Kia Motors
 General Contractor: Amco America, Ltd.
 Project Description: A 2,200 Acre (650 Acre Building Pad) automobile manufacturing plant consisting of a stamping, welding, painting and general assembly shop with an annual production capacity of 300,000 units.


image-placeholder.png
Hyundai Motors Manufacturing Alabama
 Location: Montgomery, Alabama
 Total Initial Investment: $1.1 Billion +
 AEI Scope: Main Electrical Distribution Equipment Supply and Testing
 Owner: Hyundai Motors
 Project Description: 2-Million Sq-ft automobile assembly plant consisting of a stamping, welding, painting, engine and general assembly shop with an annual production capacity of 395,800 units 


image-placeholder.png
KIA Motors Mexico Affiliates
 Location: Monterrey, Mexico
 Total Investment: Excess of $1 Billion USD
 AEI Scope: Main Electrical Distribution Equipment, Emergency Power System & Power Panels Supply Installation & Commissioning
 Owner: Hyundai MOBIS & Hyundai WIA
 General Contractor: Hyundai Engineering
 Project Description: Automobile manufacturing plant consisting of a lamp, chassis, plastic, module, engine, dymos, die cast, and utility shop with an annual production capacity of 300,000 units. 


image-placeholder.png
Hankook Tire USA
  Location: Clarksville, TN
 Total Investment: Excess of $800 Million USD
 AEI Scope: Main Electrical Distribution  Equipment & Power Panels Supply & Commissioning
 Owner: Hankook Tire
 General Contractor: Daelim Industrial Co.
 Project Description: 1.5 million sq. ft. state-of-the-art tire manufacturing plant that will generate 16,000 tires per day with tire testing track. 


image-placeholder.png
United States Army Garrison Camp Walker
 Location: Daegu, South Korea
 Total Investment: Excess of $500 Million USD
 AEI Scope: Outdoor Pad Mounted Switchgear
 Owner: United States Army
 General Contractor: Limkwang Construction 
 Project Description: Spanning over 94 acres, Camp Walker provides military family housing for about 100 military and civilian families. Also on Camp Walker are Daegu High School, the main Exchange and DeCA Commissary, the Camp Walker Army Lodge, the Evergreen Golf Course, Kelly Gym and Athletic Field, and several Family, Morale, Welfare and Recreation (FMWR) clubs


image-placeholder.png
United States Army Garrison Camp Humphreys
Location: Pyeongtaek, South Korea
 Total Investment: Excess of $2.5 Billion USD
 AEI Scope: Outdoor Metal Clad & Pad-Mounted Switchgear 
 Owner: United States Army
 General Contractor: SK Engineering and Construction 
 Project Description: Camp Humphreys is home to Desiderio Army Airfield, the busiest U.S. Army airfield in Asia. In addition to the airfield, Camp Humphreys procures U.S. Army direct support, transportation, and tactical units

image-placeholder.png
Additional Projects:

Hyundai Translead Tijuana Original Construction

Hyundai Translead Tijuana: Phase II

LG Hausys Plant Project in Georgia

LG Hausys Expansion Project

MOBIS Plant Project Alabama

Tesla Nevada Project

Wooshin Michigan plant Project

K Industry Texas Project

KEFICO Monterrey Mexico Project


File

Sampling of Major Projects Presentation

Download PDF